„”
Installation of the DRX600 (FMP) in 1995
Installation of the DMX750 in 1996/1997
Installation of DRX600 (PSF) in 1999
Installation of the AV600WB in 2003
Installation of the AV300 in 2005
Installation of the AV700WB in 2005
Installation of the AV400WB in 2007
Crash at the AV750 in June 2008
Reshuffeling of the two 400 MHz spectrometer in 2008
Installation of the AV600 in 2008
Installation of the Gyrotron in 2009
Setup of the nitrogen tanks at NMR-II in 2009
Renovation of the "old" 600 in 2010